Critical Path Analysis in Practice

Critical Path Analysis in Practice by Unknown


Authors
Unknown
ISBN
9780415264723
Published
Binding
Hardcover
Pages
166
Dimensions
140 x 216mm

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.
322.99


This product is unable to be ordered online. Please check in-store availability.
Enter your Postcode or Suburb to view availability and delivery times.

You might also like

The God Delusion
26.99
26.99
_% Off
Songlines
26.99
26.99
_% Off
The Psychopath Test
24.99
24.99
_% Off

RRP refers to the Recommended Retail Price as set out by the original publisher at time of release.
The RRP set by overseas publishers may vary to those set by local publishers due to exchange rates and shipping costs.
Due to our competitive pricing, we may have not sold all products at their original RRP.